Planning workspacePlanning workspace
DraftConnected demand → finished goods → materials
Business flow · W40 draft
Step 3 of 9 · Consensus
PREPARE
01✓
Refresh inputs
Complete
02•
Check data
Current
BUILD
03✓
Forecast
Current
04⟳
Approve demand
Waiting
05⟳
Plan FG
Waiting
06⟳
Calculate materials
Waiting
ACT
07○
Resolve
Waiting
08○
Share plan
Waiting
09○
Track actuals
Waiting
01 · DEMAND
Demand Forecast
Consensus demand, baseline & weekly overrides
02 · FINISHED GOODS
Production Plan & MPS
Finished goods schedule, net batch capacity & stock
03 · MATERIALS
Material Requirements (MRP)
Time-phased BOM explosion, netting & PO releases
Consensus demand · building
0 item adjustments · generated via Regression
Forecast method: Food & Us formula (v1)
Configure / Backtest Seasonality →Adjustments open
Weekly demand
0 itemsFinished product Click a week to inspect or adjust | Unit | W48 · 23 Nov | W49 · 30 Nov | W50 · 7 Dec | W51 · 14 Dec | Status |
|---|
Click a weekly number to see its calculation, assumptions and source lineage. Quantities are illustrative, not validated workbook outputs.
Method and lineage
Demand version, FG stock, lead and safety policy feed the proposal. Trace each quantity back to these inputs.
Before the plan can be shared
FG production overrides require a reason and refresh BOM impact. Validate FG stock before releasing the plan.